top of page

PROJECT

Nike Headquarters

Projected Completion: 2020

Location: Portland, OR

General Contractor: Swinerton

This project was a full-on interior demolition of all interior construction items in two 4-story buildings; the Alberto Salazar building and the John McEnroe building.

 

All of the gypsum board walls, flooring, and ceiling were removed, leaving a shell. 

Concrete slab cutting and core drilling will be done to complete the project.

bottom of page